Asian Journal of Information Technology

Year: 2017
Volume: 16
Issue: 8
Page No. 650 - 659

Estimation of Time and Cost in Prefabrication Construction AID of ANN with SSO

Authors : S. Ashok Manikandan and K.C. Pazhani

References

Arashpour, M., R. Wakefield, N. Blismas and J. Minas, 2015. Optimization of process integration and multi-skilled resource utilization in off-site construction. Autom. Constr., 50: 72-80.
Direct Link  |  

Aye, L., T. Ngo, R.H. Crawford, R. Gammampila and P. Mendis, 2012. Life cycle greenhouse gas emissions and energy analysis of prefabricated reusable building modules. Energy Build., 47: 159-168.
Direct Link  |  

Babic, N.C., P. Podbreznik and D. Rebolj, 2010. Integrating resource production and construction using BIM. Automation Construc., 19: 539-543.
CrossRef  |  

Berner, F., V. Kochkine, I. Habenicht, S. Spieckermann and C. Vath, 2013. Simulation in manufacturing planning of buildings. Proceedings of the 2013 Winter Simulation Conference on Simulation Making Decisions in a Complex World, December 08-11, 2013, IEEE, Piscataway, New Jersey, ISBN:978-1-4799-2077-8, pp: 3306-3317.

Cao, D., G. Wang, H. Li, M. Skitmore and T. Huang et al., 2015. Practices and effectiveness of building information modelling in construction projects in China. Autom. Constr., 49: 113-122.
Direct Link  |  

Chen, Y., G.E. Okudan and D.R. Riley, 2010. Decision support for construction method selection in concrete buildings: Prefabrication adoption and optimization. Automation Construc., 19: 665-675.
CrossRef  |  

Cuevas, E., M. Cienfuegos, D. Zaldivar and C.M. Perez, 2013. A swarm optimization algorithm inspired in the behavior of the social-spider. Expert Syst. Applic., 40: 6374-6384.
CrossRef  |  Direct Link  |  

Feng, C.W., Y.J. Chen and J.R. Huang, 2010. Using the MD CAD model to develop the time-cost integrated schedule for construction projects. Automation Constr., 19: 347-356.
CrossRef  |  

Hong, Y.Y., 2011. The construction project bid evaluation based on gray relational model. Procedia Eng., 15: 4553-4557.
Direct Link  |  

James, J.Q. and V.O. Li, 2015. A social spider algorithm for global optimization. Appl. Soft Comput., 30: 614-627.
Direct Link  |  

Konig, M., C. Koch, I. Habenicht and S. Spieckermann, 2012. Intelligent BIM-based construction scheduling using discrete event simulation. Proceedings of the 2012 Simulation Conference (WSC), December 9-12, 2012, IEEE, Bochum, Germany, ISBN:978-1-4673-4779-2, pp: 1-12.

Kumar, A. and P.C. Gupta, 2012. Identification and analysis of failure attributes for an ERP system. Procedia Soc. Behav. Sci., 65: 986-991.
Direct Link  |  

Lener, G., D. Reiterer and A. Hauser, 2013. Numerical simulation of the total service life time of steel constructions including fracture mechanic concepts. Procedia Eng., 66: 334-342.
Direct Link  |  

Makovsek, D., 2014. Systematic construction risk, cost estimation mechanism and unit price movements. Trans. Policy, 35: 135-145.
Direct Link  |  

Moradchelleh, A., 2011. Construction design zoning of the territory of Iran and climatic modeling of civil buildings space. J. King Saud Univ. Sci., 23: 355-369.
Direct Link  |  

Mungle, S., L. Benyoucef, Y.J. Son and M.K. Tiwari, 2013. A fuzzy clustering-based genetic algorithm approach for time-cost-quality trade-off problems: A case study of highway construction project. Eng. Appl. Artif. Intell., 26: 1953-1966.
Direct Link  |  

Nahmens, I. and L.H. Ikuma, 2011. Effects of lean construction on sustainability of modular homebuilding. J. Archit. Eng., 18: 155-163.
Direct Link  |  

Pan, W., A.R. Dainty and A.G. Gibb, 2012. Establishing and weighting decision criteria for building system selection in housing construction. J. Constr. Eng. Manage., 138: 1239-1250.
Direct Link  |  

Sadowski, L. and J. Hola, 2015. ANN modeling of pull-off adhesion of concrete layers. Adv. Eng. Software, 89: 17-27.
Direct Link  |  

Treacy, M.A. and E. Bruhwiler, 2015. A direct monitoring approach for the fatigue safety verification of construction joint details in an existing post-tensioned concrete box-girder bridge. Eng. Struct., 88: 189-202.
Direct Link  |  

Trinkuniene, E. and V. Trinkunas, 2014. Information system for construction contracts structural analysis. Procedia Soc. Behav. Sci., 110: 1226-1234.
Direct Link  |  

Williams, T.P. and J. Gong, 2014. Predicting construction cost overruns using text mining, numerical data and ensemble classifiers. Autom. Constr., 43: 23-29.
Direct Link  |  

Wu, Z. and R. Shen, 2012. Safety evaluation model of highway construction based on fuzzy grey theory. Procedia Eng., 45: 64-69.
Direct Link  |  

Zhao, Y., X. Liu and Y. Zhao, 2011. Forecast for construction engineering risk based on fuzzy sets and systems theory. Syst. Eng. Procedia, 1: 156-161.
Direct Link  |  

Design and power by Medwell Web Development Team. © Medwell Publishing 2024 All Rights Reserved