Journal of Engineering and Applied Sciences
Year:
2015
Volume:
10
Issue:
7
Page No.
167 - 173
Fuzzy Inference System (FIS) Based Worker Assignment Model for Virtual Cells
Authors :
R.V.Murali
References
Bidanda, B., P. Ariyawongrat, K.L. Needy, B.A. Norman and W. Tharmmaphornphilas, 2005. Human related issues in manufacturing cell design, implementation and operation: A review and survey. Comput. Ind. Eng., 48: 507-523.
CrossRef | Direct Link | Mathworks, 2011. MATLAB, The language of technical computing. The MathWorks Inc., Natick.
McDonald, T., K.P. Ellis, E.M. Van Aken and C.P. Koelling, 2009. Development and application of a worker assignment model to evaluate a lean manufacturing cell. Int. J. Prod. Res., 47: 2427-2447.
CrossRef | Direct Link | Murali, R.V., 2010. ANN worker assignment model with real time industrial data. Int. J. Ind. Eng. Pract., 2: 41-47.
Murali, R.V., A.B. Puri and G. Prabhakaran, 2010. Artificial neural networks based predictive model for worker assignment into virtual cells. Int. J. Eng. Sci. Technol., 2: 163-174.
Direct Link | Nomden, G., J. Slomp and N.C. Suresh, 2006. Virtual manufacturing cells: A taxonomy of past research and identification of future research. Int. J. Flexible Manuf. Syst., 17: 71-92.
CrossRef | Direct Link | Satoglu, S.I. and N.C. Suresh, 2009. A goal-programming approach for design of hybrid cellular manufacturing systems in dual resource constrained environments. Comput. Ind. Eng., 56: 560-575.
CrossRef | Direct Link | Slomp, J., B.V. Chowdary, and N.C. Suresh, 2005.. Design of virtual manufacturing cells: A mathematical programming approach. Rob. Compt. Integr. Manuf., 21: 273-288.
CrossRef | Suresh, N.C. and J. Slomp, 2005. Performance comparison of virtual cellular manufacturing with functional and cellular layouts in DRC settings. Int. J. Prod. Res., 43: 945-979.
CrossRef | Direct Link |