Journal of Engineering and Applied Sciences

Year: 2018
Volume: 13
Issue: 5
Page No. 1222 - 1227

The 4Ps: A Framework for Evaluating Construction Projects Delays

Authors : Richard Hannis Ansah, Shahryar Sorooshian and Shariman Bin Mustafa

References

Alaghbari, W., M.R.A. Kadir, A. Salim and Ernawati, 2007. The significant factors causing delay of building construction projects in Malaysia. Eng. Constr. Archit. Manage., 14: 192-206.
CrossRef  |  Direct Link  |  

Ansah, H.A., S. Sorooshain and S.B. Mustafa, 2015. Lean construction: An effective approach for project management. Proceedings of the Malaysian Technical Universities Conference on Engineering and Technology, October 11-13, 2015, KSL Hotel, Johor, Malaysia, pp: 1607-1612.

Ansah, H.R. and S. Sorooshain, 2018. 4P delays in project management. Eng. Constr. Archit. Manage., 25: 62-76.

Ansah, H.R., S. Sorooshian and S.B. Mustafa, 2016. An environmental impact framework for evaluating construction projects delays. Proceedings of the 2016 International Conference on Industrial Engineering and Operations Management Detroit, September 23-25, 2016, IEOM Society, Detroit, Michigan, pp: 764-772.

Ansah, R.H. and S. Sorooshian, 2017. Effect of lean tools to control external environment risks of construction projects. Sustainable Cities Soc., 32: 348-356.
Direct Link  |  

Arcuri, F.J., J.C. Hildreth and V. Tech, 2016. The principles of schedule impact analysis. Master Thesis, Virginia Tech, Blacksburg, Virginia.

Assaf, S.A. and S. Al-Hejji, 2006. Causes of delay in large construction projects. Int. J. Project Manage., 24: 349-357.
CrossRef  |  

Aziz, R.F. and S.M. Hafez, 2013. Applying lean thinking in construction and performance improvement. Alexandria Eng. J., 52: 679-695.
Direct Link  |  

Aziz, R.F., 2013. Ranking of delay factors in construction projects after Egyptian revolution. Alexandria Eng. J., 52: 387-406.
Direct Link  |  

Chan, D.W.M. and M.M. Kumaraswamy, 1997. A comparative study of causes of time overruns in Hong Kong construction projects. Int. J. Project Manage., 15: 55-63.
CrossRef  |  

Chua, D.K.H., Y.C. Kog and P.K. Loh, 1999. Critical success factors for different project objectives. J. Constr. Eng. Manage., 125: 142-150.
Direct Link  |  

Dissanayaka, S.M. and M.M. Kumaraswamy, 1999. Evaluation of factors affecting time and cost performance in Hong Kong building projects. Eng. Constr. Archit. Manage., 6: 287-298.
CrossRef  |  Direct Link  |  

Faridi, A.S. and S.M. El‐Sayegh, 2006. Significant factors causing delay in the UAE construction industry. Constr. Manage. Econ., 24: 1167-1176.
Direct Link  |  

Glenn, E., 2007. The importance and awesome power of project management in today’s business environment. Renaissance Group LLC, Cincinnati, Ohio, USA.

Iyer, K.C. and K.N. Jha, 2006. Critical factors affecting schedule performance: Evidence from Indian construction projects. J. Constr. Eng. Manage., 132: 871-881.
CrossRef  |  Direct Link  |  

Lowsley, S. and C. Linnett, 2006. About time - : delay analysis in construction. Royal Institution of Chartered Surveyors, Parliament Square, London, Englnad, UK.

Majid, I.A., 2006. Causes and effects of delays in ACEH construction industry. Ph.D Thesis, Universiti Teknologi Malaysia, Johor Bahru, Malaysia.

Memon, A.H., I.A. Rahman, M.R. Abdullah and A.A.A. Azis, 2014. Factors affecting construction cost performance in project management projects: Case of MARA large projects. Intl. J. Civ. Eng. Built Environ., 1: 30-35.
Direct Link  |  

Mezher, T.M. and W. Tawil, 1998. Causes of delays in the construction industry in Lebanon. Eng. Constr. Arch. Manage. J., 5: 252-260.
CrossRef  |  

Owolabi, J.D., L.M. Amusan, C.O. Oloke, O. Olusanya and P.F. Tunji-Olayeni et al., 2014. Causes and effect of delay on project construction delivery time. Intl. J. Educ. Res., 2: 197-208.
Direct Link  |  

Ramabodu, M.S. and J.J.P. Verster, 2010. Factors contributing to cost overruns of construction projects. Proceeding of the 5th ASOCSA Conference on Built Environment, July 18-20, 2010, ASOCSA, Durban South Africa, ISBN:978-0-620-46703 -2, pp: 131-143.

Sadi, A.A., M. Al-Khalil and M. Al-Hazmi, 1995. Causes of delay in large building construction projects. J. Manage. Eng., 11: 45-50.
CrossRef  |  Direct Link  |  

Salleh, R., 2009. Critical success factors of project management for Brunei construction projects: Improving project performance. Ph.D Thesis, Brisbane, Australia.

Salunkhe, A.A. and R.S. Patil, 2014. Effect of construction delays on project time overrun: Indian scenario. Intl. J. Res. Eng. Technol., 3: 543-547.
Direct Link  |  

Sambasivan, M. and Y.W. Soon, 2007. Causes and effects of delays in Malaysian construction industry. Intl. J. Project Manage., 25: 517-526.
Direct Link  |  

Shehu, Z., I.R. Endut and A. Akintoye, 2014. Factors contributing to project time and hence cost overrun in the Malaysian construction industry. J. Financial Manage. Property Constr., 19: 55-75.
CrossRef  |  Direct Link  |  

Shehu, Z., I.R. Endut, A. Akintoye and G.D. Holt, 2014. Cost overrun in the Malaysian construction industry projects: A deeper insight. Int. J. Project Manage., 32: 1471-1480.
Direct Link  |  

Singh, R., 2010. Delays and cost overruns in infrastructure projects: Extent, causes and remedies. Econ. Political Weekly, 45: 43-54.
Direct Link  |  

Sorooshian, S., 2014. Delay-based reliability analysis on construction projects. Life Sci. J., 11: 104-113.
Direct Link  |  

Tumi, S.A.H., A. Omran and A.H.K. Pakir, 2009. Causes of delay in construction industry in Libya. Proceedings of the International Conference on Economics and Administration, November 14-15, 2009, University of Bucharest, Romania, pp: 265-272.

Walker, D.H.T., 1995. An investigation into construction time performance. Construct. Manage. Econ., 13: 263-274.
CrossRef  |  

Design and power by Medwell Web Development Team. © Medwell Publishing 2024 All Rights Reserved