Journal of Engineering and Applied Sciences
Year:
2019
Volume:
14
Issue:
7
Page No.
2177 - 2186
References
Abdillah, W. and J. Hartono, 2015. [Partial Least Square (PLS) Alternative Structural Equation Modeling (SEM) in Business Research]. Penerbit Andi, Yogyakarta, Indonesia, ISBN:9789792952162, Pages: 272 (In Indonesian).
Anonymous, 1983. Road maintenance manual No.03/MN/B/1983. Directorate General of Highways, Jakarta, Indonesia.
Anonymous, 1983. Routine maintenance manual for national and provincial roads volume II title of standard improvement method No. 002/T/Bt/1995. Directorate General of Highways, Jakarta, Indonesia.
Anonymous, 1995. Technical guidance survey of road engineering planning No. 013/T/Bt/1995. Directorate General of Highways, Jakarta, Indonesia.
Anonymous, 2002. Survey of paved road conditions in urban areas, urban governance and rural governance department of residential and infrastructure. Directorate of Technical Affairs, Jakarta, Indonesia.
Anonymous, 2004. Law of the republic of Indonesia No. 38 of 2004 on Roads. Department of General Workers, Directorate General of Highways, Jakarta, Indonesia.
Anonymous, 2004. Survey guidelines of traffic enumerator Pd.T-19-2004.B. Department of General Workers, Directorate General of Highways, Jakarta, Indonesia.
Anonymous, 2011. Guidance on road condition survey No. 001-04/P/BM/2011. Ministry of Public Works, Jakarta, Indonesia.
Anonymous, 2011. Road survey guideline No. 001-04/P/BM/2011. Ministry of Public Works, Jakarta, Indonesia.
Anonymous, 2012. General guidelines for disaster risk assessment. National Disaster Management Agency (BNBP), Jakarta, Indonesia.
Anonymous, 2013. Indonesia’s Disaster Risk Index (IRBI). National Agency for Disaster Management (BNPB), Jakarta, Indonesia.
Asad, A.M., S. Lawalenna, S.A. Adisasmita and M.I. Ramli, 2013. A comprehensive framework for evaluating the feasibility of upgrading road category based on analytic hierarchy process: Case study in South Sulawesi Province, Indonesia. Proc. East Asia Soc. Transp. Stud., Vol. 9,
Ghozali, I., 2004. Structural Equation Modeling: An Alternative Method with Partial Least Square (PLS). 4th Edn., Diponegoro University, Semarang, Indonesia,.
Hamzah, S., S.A. Adisasmita, T. Harianto and M.S. Pallu, 2014. Private involvement in sustainable management of Indonesian port: Need and strategy with PPP scheme. Procedia Environ. Sci., 20: 187-196.
Direct Link | Latan, H. and I. Gozali, 2012. Partial Least Square, Concepts, Techniques and Applications Smart PLS 2.0 M3. Diponegoro University, Semarang, Indonesia,.
Saaty, T.L., 2001. The Analyze Hierarchy Process, Planning, Priority, Setting, Resource Allocation. McGraw-Hill Education, New York, USA.,.
Saing, Z., L. Samang, T. Harianto and J. Palanduk, 2018. Bearing capacity characteristic of subgrade layer quicklime treated laterite soil. Proceedings of the 1st International MATEC Web Symposium on Transportation Studies for Developing Countries (ISTSDC 2017) Vol. 181, November 4, 2018, EDP Sciences, Les Ulis, France, pp: 1-7.
Saing, Z., L. Samang, T. Harianto and J. Patanduk, 2017. Study on characteristic of laterite soil with lime stabilization as a road foundation. Intl. J. Appli. Eng. Res., 12: 4687-4693.
Direct Link | Savitri, D.A.W., D.P. Wedagama and I.G.P. Suparsa, 2015. [Analysis of priority determination of handling roads in Denpasar city based on Analytic Hierarchy Process (AHP) method with a combination of Fuzzy Analytic Hierarchy Process (FAHP) and topsis methods (In Indonesian)]. J. Spektran, Vol. 3,