Journal of Engineering and Applied Sciences
Year:
2019
Volume:
14
Issue:
19
Page No.
7154 - 7158
References
Argimbaev, K.R. and H.A. Kholodjakov, 2013. Determining the safe working height of an power shovel for the development of iron-bearing tailing dumps. World Appl. Sci. J., 27: 1087-1090.
Direct Link | Argimbaev, K.R. and M.M. Yakubovskiy, 2014. Economic substantiation of a quarry usage and an overburden dumps, considering the disposal of industrial waste in them. World Appl. Sci. J., 29: 1621-1625.
Direct Link | Burmistrov, K.V., N.A. Osintsev and A.N. Shakshakpaev, 2017. Selection of open-pit dump trucks during quarry reconstruction. Procedia Eng., 206: 1696-1702.
CrossRef | Direct Link | Gavrishev, S.E., K.V. Burmistrov, S.N. Kornilov and N.G. Tomilina, 2016. Evaluation of transportation flow charts with open-pit hoisting systems in open pit/underground mining. Gornyi Zh., 5: 41-47.
CrossRef | Direct Link | Kaerbek, R.A. and B.O. Maya, 2016. The experience of the introduction of mobile crushing and screening complexes on a deposit of building materials. Res. J. Appl. Sci., 11: 300-303.
Ligotsky, D.N. and K.V. Mironova, 2018. Perspective technology of open-pit mining of limestone and dolomite. J. Eng. Appl. Sci., 13: 1613-1616.
CrossRef | Direct Link | Loginov, E.V., 2015. Improving the efficient of mining in the deposit of broken stone. Sci. Rep. Resour., 1: 183-185.
Pikalov, V.A., A.V. Sokolovsky, V.N. Vasilets and K.V. Burmistrov, 2016. Substantiation of efficient parameters for hybrid open pit-underground mining of coal. Gornyi Zhurnal, 1: 67-72.
Rafkatovich, A.K. and K.V. Mironova, 2018. Methods for the reduction of loss and optimization processes open pit mining operations when mining man-made deposits formed by sections. J. Eng. Appl. Sci., 13: 1624-1631.
Direct Link |