Journal of Engineering and Applied Sciences

Year: 2010
Volume: 5
Issue: 3
Page No. 226 - 228

Determination of Stresses and Deformation During Measurements with Loading Method on Central Ore Pillars in TREPCA Mine

Authors : Ismet Ibishi and Gzim Ibishi

Abstract: The most rational mean of using ore body in TREPCA mine is to put security pillars from the ore, these pillars have square cross section size at starter 10x10 m. This way of formation of pillars is done utilizing central ore troops which have great amount of the ore body. Whether the pillars formed analyzed in terms of sustainability, we can state that they are stabile and they possess a high safety factor. We have to state that for the first time determination of stresses in pillars of ore is done in workshop 130 directly with method of measurements.

How to cite this article:

Ismet Ibishi and Gzim Ibishi, 2010. Determination of Stresses and Deformation During Measurements with Loading Method on Central Ore Pillars in TREPCA Mine. Journal of Engineering and Applied Sciences, 5: 226-228.

Design and power by Medwell Web Development Team. © Medwell Publishing 2024 All Rights Reserved