Schedule Variance: A Monetary Value to Determine Time Variancein Construction Project

Authors : Waldevique FrancoBorges Jr

References

Acebes, F., M. Pereda, D. Poza, J. Pajares and J.M. Galan, 2015. Stochastic earned value analysis using Monte Carlo simulation and statistical learning techniques. Intl. J. Project Manage., 33: 1597-1609.
Direct Link  |  

Arroyo, L.M.A., 2012. Pragmatic earned value model to effectively plan and control construction projects. AACE. Intl. Trans., 1: 1049.01-1049.37.

Batselier, J. and M. Vanhoucke, 2015. Construction and evaluation framework for a real-life project database. Intl. J. Project Manage., 33: 697-710.
Direct Link  |  

Bhosekar, S.K. and G. Vyas, 2012. Cost controlling using earned value analysis in construction industries. Intl. J. Eng. Innovative Technol., 1: 324-332.

Colin, J. and M. Vanhoucke, 2015. A comparison of the performance of various project control methods using earned value management systems. Expert Syst. Appl., 42: 3159-3175.
Direct Link  |  

Creese, R.C. and Y. Fang, 2010. Time-based schedule performance index. Cost Eng. J., 52: 18-20.

De Marco, A. and T. Narbaev, 2013. Earned value-based performance monitoring of facility construction projects. J. Facil. Manage., 11: 69-80.
CrossRef  |  Direct Link  |  

Farok, G.M.G. and J.A. Garcia, 2015. Developing group leadership and communication skills for monitoring EVM in project management. J. Mech. Eng., 45: 53-60.
CrossRef  |  Direct Link  |  

Lipke, W., 2014. Introduction to earned schedule. Project Manage. World J., 3: 1-11.
Direct Link  |  

Narbaev, T. and A. De Marco, 2014. An earned schedule-based regression model to improve cost estimate at completion. Intl. J. Project Manage., 32: 1007-1018.
CrossRef  |  Direct Link  |  

PMI., 2013. A Guide to the Project Management Body of Knowledge (PMBOK GUIDE). 5th Edn., Project Management Institute, Pennsylvania, USA., ISBN:9781935589679, Pages: 589.

Steele, M.D., 2013. An earned value analysis framework for evaluating project portfolios. AACE Intl. Trans., 1: 1333.1-1333.12.

Vanhoucke, M., P. Andrade, F. Salvaterra and J. Batselier, 2015. Introduction to earned duration. Measurable News, 1: 15-27.
Direct Link  |  

Vignesh, N. and S. Sowmya, 2013. Analysis of estimate at completion of a project’s duration to improve earned value management system. Intl. J. Eng. Res. Technol., 2: 1056-1061.
Direct Link  |  

Warburton, R.D.H., 2014. A new schedule estimation technique for construction projects. Organiz. Technol. Manage. Constr. Intl. J., 6: 1075-1082.
Direct Link  |  

Warhoe, S.P., 2004. The basics of earned value management. AACE Intl. Trans., 1: CS71-CS80.
Direct Link  |  

Wyrozebski, P. and K. Lysik, 2013. Time and cost controlling with earned value technique-yellow pages directory case study. J. Manage. Financial Sci., 6: 51-69.
Direct Link  |  

Design and power by Medwell Web Development Team. © Medwell Publishing 2024 All Rights Reserved