Journal of Engineering and Applied Sciences

Year: 2016
Volume: 11
Issue: 7
Page No. 1532 - 1537

Analyzing the Change Orders Impact on Building Projects

Authors : Sonia Ahmed, Bassam Hasan, Fayez Jrad and Petr Dlask

References

AbouRizk, S.M. and S.P. Dozzi, 1993. Application of computer simulation in resolving construction disputes. J. Constr. Eng. Manage., 119: 355-373.
Direct Link  |  

Alnuaimi, A., R. Taha, Mohsin, A.M. and A.A. Harthi, 2010. Causes, effects, benefits and remedies of change orders on public construction projects in Oman. J. Constr. Eng. Manage., 136: 615-622.
Direct Link  |  

Ashich, Z.S., 1996. Managing the Implementation of Engineering Projects. Library Al Abikan, Riyadh, Saudi Arabia, Pages: 340.

Assaf, S.A. and S. Al-Hejji, 2006. Causes of delay in large construction projects. Int. J. Project Manage., 24: 349-357.
CrossRef  |  

Binti, N.I., 2006. Variation orders in Universiti Teknologi Malaysia (UTM) construction projects. Master Thesis, Universiti Teknologi Malaysia, Bahru, Malaysia.

Chen, J.H. and S.C. Hsu, 2007. Hybrid ANN-CBR model for disputed change orders in construction projects. Autom. Constr., 17: 56-64.
Direct Link  |  

Dubaisi, A.H.A., 2000. Change orders in construction projects in Saudi Arabia. Master Thesis, Presented to the King Fahd University of Petroleum and Minerals Dhahran, Saudi Arabia.

Fisk, E., 1990. Management of construction projects. The General Directorate of Research Institute of Public Administration Higher, Riyadh, Saudi Arabia.

Frimpong, Y., J. Oluwoye and L. Crawford, 2003. Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study. Int. J. Project Manage., 21: 321-326.
CrossRef  |  Direct Link  |  

Hanna, A.S. and M. Gunduz, 2004. Impact of change orders on small labor-intensive projects. J. Constr. Eng. Manage., 130: 726-733.
Direct Link  |  

Hanna, A.S., J.S. Russell, T.W. Gotzion and E.V. Nordheim, 1999. Impact of change orders on labor efficiency for mechanical construction. J. Constr. Eng. Manage., 125: 176-184.
Direct Link  |  

Sambasivan, M. and Y.W. Soon, 2007. Causes and effects of delays in Malaysian construction industry. Int. J. Project Manage., 25: 517-526.

Wu, C.H., T.Y. Hsieh and W.L. Cheng, 2005. Statistical analysis of causes for design change in highway construction on Taiwan. Int. J. Project Manage., 23: 554-563.
Direct Link  |  

Design and power by Medwell Web Development Team. © Medwell Publishing 2024 All Rights Reserved