Journal of Engineering and Applied Sciences
Year:
2016
Volume:
11
Issue:
12
Page No.
2800 - 2803
References
Bertrand, J.W.M., 1985. Multiproduct optimal batch sizes with in-process inventories and multi work centers. IIE. Trans., 17: 157-163.
Direct Link | Ojha, D., B.R. Sarker and P. Biswas, 2007. An optimal batch size for an imperfect production system with quality assurance and rework. Intl. J. Prod. Res., 45: 3191-3214.
Direct Link | Parija, G.R. and B.R. Sarker, 1999. Operations planning in a supply chain system with fixed-interval deliveries of finished goods to multiple customers. IIE Trans., 31: 1075-1082.
CrossRef | Direct Link | Rau, H. and B.C. OuYang, 2008. An optimal batch size for integrated production-inventory policy in a supply chain. Eur. J. Oper. Res., 185: 619-634.
Direct Link | Wang, H.C. and Y.S. Chen, 2005. Mathematical model with simulation to find the optimal batch size for a supply chain system. J. Chin. Inst. Ind. Eng., 22: 262-271.
Direct Link | Wang, S. and B.R. Sarker, 2004. A single-stage supply chain system controlled by kanban under just-in-time philosophy. J. Oper. Res. Soc., 55: 485-494.