Journal of Engineering and Applied Sciences
Year:
2017
Volume:
12
Issue:
24
Page No.
7656 - 7661
References
Ghozali, I., 2006. Application of Multivariate Analysis with SPSS Program. Badan Penerbit Universitas Diponegoro, Semarang, Indonesia,.
Ram, A. and P. Pratheeba, 2015. Study on construction sequence delay for road infrastructure projects. IOSR. J. Mech. Civ. Eng., 12: 15-21.
Direct Link | Raymond, P.D., F.S. Bonny and T. Huibert, 2012. Factor analysis causes equipment cost overrun on dock construction project in North Sulawesi. Media Eng., 2: 153-162.
Soeharto, I., 2001. Construction Project Management. Penerbit Erlangga, East Jakarta, Indonesia,.
Sudarsana, D.K., H. Sulistio, A. Wicaksono and L. Djakfar, 2014. A study of safe and green infrastructure on road reconstruction project. Adv. Environ. Biol., 1: 616-621.
Direct Link | Sukaarta, I.W., S.F. Bonny and T. Huibert, 2012. Risk analysis of trestle dock project. Media Eng. J., 2: 257-266.