Journal of Engineering and Applied Sciences
Year:
2019
Volume:
14
Issue:
3 SI
Page No.
6093 - 6096
References
Bakhary, N.A., H. Adnan and A. Ibrahim, 2015. A study of construction claim management problems in Malaysia. Procedia Econ. Finance, 23: 63-70.
Direct Link | Cheong Y.Y. and M.N. Emma, 2012. Analysis of factors critical to construction project success in Malaysia. Eng. Constr. Archit. Manage., 19: 543-556.
Direct Link | Duat, H.Y.A.R., 2014. Causes of time delay in construction Sarawak, Malaysia. BS Thesis, Universiti Malaysia Pahang, Gambang, Malaysia.
Hamid, A.R.A., B. Singh, A.M. Yusof and N.A.M. Abdullah, 2011. The employment of foreign workers at construction sites. Proceedings of the 2nd International Conference on Construction and Project Management Vol. 15, June 28, 2011, IACSIT Press, Singapore, pp: 126-130.
Hamid, A.R.A., B. Singh, W.Z.W. Yusof, A.M. Yusof and N. Mustafa, 2011. Problems faced by contractors in managing foreign workers on construction sites. Proceedings of the 2nd International Conference on Construction and Project Management (IPEDR) Vol. 15, September 16-18, 2011, IACSIT Press, Singapore, pp: 131-135.
Hasmori, M.F., I. Said, R. Deraman, N.H. Abas and S. Nagapan
et al., 2018. Significant factors of construction delays among contractors in Klang Valley and its mitigation. Intl. J. Integr. Eng., 10: 32-36.
Direct Link | Hussin, J.M., I.A. Rahman and A.H. Memon, 2013. The way forward in sustainable construction: Issues and challenges. Intl. J. Adv. Appl. Sci., 2: 15-24.
Direct Link | Ikau, R., C. Joseph and R. Tawie, 2016. Factors influencing waste generation in the construction industry in Malaysia. Procedia Soc. Behav. Sci., 234: 11-18.
CrossRef | Direct Link | Jabar, L.I., F. Ismail and A.A. Mustafa, 2013. Issues in managing construction phase of IBS projects. Procedia Social Behav. Sci., 101: 81-89.
Direct Link | Ullah, K., M.S. Khan, M.T. Lakhiar, A.A. Vighio and S. Sohu, 2018. Ranking of effects of construction delay: Evidence from Malaysian building projects. J. Appl. Eng. Sci., 8: 79-84.
CrossRef | Direct Link | Yee, K.C.W.H., A.R.A. Hamid and H.Z.A. Zahari, 2017. Foreign workers composition at construction site. J. Adv. Res. Des., 30: 12-21.