Asian Journal of Information Technology

Year: 2014
Volume: 13
Issue: 2
Page No. 89 - 92

Exploring on Budget Constraint Scheduling Algorithms in Grid Computing

Authors : I. Stephie Rachel and S. Devi Priya

References

Bsoul, M., I. Phillips and C. Hinde, 2006. A framework for economic scheduling in grid computing using tender/contract-net model. Proceedings of the 7th Annual Post Graduate Symposium on the Convergence of Telecommunications, Networking and Broadcasting, June 26-27, 2006, Liverpool John Moores University, Liverpool, UK., pp: 1-6.

Bsoul, M., I. Phillips and C. Hinde, 2012. MICOSim: A imulator for modelling economic scheduling in grid computing. World Acad. Sci. Engin. Technol., 68: 1298-1301.
Direct Link  |  

Buyya, R., M. Murshed and D. Abramson, 2002. A deadline and budget constrained cost-time optimization algorithm for scheduling task farming applications on global grids. Proceedings of the 2002 International Conference on Parallel and Distributed Processing Techniques and Applications, June 2002, Las Vegas, Nevada, USA., pp: 1-7.

Dabrowski, C., 2009. Reliability in grid computing systems. Concurrency Computat.: Pract. Exper., 21: 927-959.
CrossRef  |  Direct Link  |  

Dogan, A. and F. Ozguner, 2005. Biobjective scheduling algorithms for execution time-reliability trade-off in heterogeneous computing systems. Comput. J., 48: 300-314.
CrossRef  |  Direct Link  |  

Grimshaw, A.S., 2009. What is a grid? Grid Today, Vol. 1, No. 26, December 9, 2002. http://grid.desy.de/docs/GRIDtoday/100840.html.

Maheswaran, M., S. Ali, H.J. Siegel, D. Hensgen and R.F. Freund, 1999. Dynamic mapping of a class of independent tasks onto heterogeneous computing systems. J. Parallel Distrib. Comput., 59: 107-131.
CrossRef  |  

Rachel, I.S., J.S. Raj and V. Vasudevan, 2013. A reliable schedule with budget constraints in grid computing. Int. J. Comput. Applic., 64: 23-28.
CrossRef  |  Direct Link  |  

Sakellariou, R., H. Zhao, E. Tsiakkouri and M.D. Dikaiakos, 2007. Scheduling Workflows with Budget Constraints. In: Integrated Research in GRID Computing, Gorlatch, S. and M. Danelutto (Eds.). Springer-Verlag, USA., pp: 189-202.

Srinivasan, S. and N.K. Jha, 1999. Safety and reliability driven task allocation in distributed systems. IEEE Trans. Parallel Distrib. Syst., 10: 238-251.
CrossRef  |  Direct Link  |  

Tang, X., K. Li, M. Qiu and E.H.M. Sha, 2012. A hierarchical reliability-driven scheduling algorithm in grid systems. J. Parallel Distrib. Comput., 72: 525-535.
CrossRef  |  

Tang, X., K. Li, R. Li and B. Veeravalli, 2010. Reliability-aware scheduling strategy for heterogeneous distributed computing systems. J. Parallel Distrib. Comput., 70: 941-952.
CrossRef  |  Direct Link  |  

Venugopal, S. and R. Buyya, 2005. A deadline and budget constrained scheduling algorithm for science applications on data grids. In: Distributed and Parallel Computing, Hobbs, M., A.M. Goscinski and W. Zhou (Eds.). Springer-Verlag, Berlin, Heidelberg, pp: 60-72.

Yu, J. and R. Buyya, 2006. A budget constrained scheduling of workflow applications on utility grids using genetic algorithms. Proceedings of the Workshop on Workflows in Support of Large-Scale Science, June 19-23, 2006, Paris, pp: 1-10.

Design and power by Medwell Web Development Team. © Medwell Publishing 2024 All Rights Reserved