Journal of Engineering and Applied Sciences

Year: 2010
Volume: 5
Issue: 2
Page No. 71 - 77

Application of Lean Production System in the Construction Industry: An Empirical Study

Authors : Chien-HoKo

References

Adenso-Diaz, B., I. Gonzalez and J. Tuya, 2004. Incorporating fuzzy approaches for production planning in complex industrial environments: The roll shop case. Eng. Appl. Artif. Intell., 17: 73-81.
CrossRef  |  

Ballard, G. and R. Arbulu, 2004. Taking prefabrication lean. Proceedings of the 12th Annual Conference of the International Group for Lean Construction, Aug. 3-6, Helsingor, Denmark, pp: 1-14.

Krafcik, J.F., 1988. Triumph of the lean production system. Sloan Manage. Rev., 30: 41-52.

Wang, W., D. Wang and W.H. Ip, 1999. JIT production planning approach with fuzzy due date for OKP manufacturing systems. Int. J. Prod. Econ., 58: 209-215.
CrossRef  |  Direct Link  |  

White, R.E. and V. Prybutok, 2001. The relationship between JIT practices and type of production system. Omega, 29: 113-124.
CrossRef  |  

Womack, J.P. and D.T. Jones, 2003. Lean Thinking: Banish Waste and Create Wealth in Your Corporation. 2nd Edn., Simon and Schuster, New York.

Zadeh, L.A., 1965. Fuzzy sets. Inform. Control, 8: 338-353.
CrossRef  |  Direct Link  |  

Design and power by Medwell Web Development Team. © Medwell Publishing 2024 All Rights Reserved