Journal of Engineering and Applied Sciences
Year:
2016
Volume:
11
Issue:
12
Page No.
2602 - 2606
References
Halim, N.H.A., A. Jaffar, N. Yusof, R. Jaafar and A.N. Adnan
et al., 2015. Standardized work in TPS production line. J. Technol., 76: 73-78.
Johansson, P.E., T. Lezama, L. Malmskold, B. Sjogren and L.M. Ahlstrom, 2013. Current state of standardized work in automotive industry in Sweden. Procedia CIRP., 7: 151-156.
CrossRef | Direct Link | Liker, J.K. and D. Meier, 2006. The Toyota way Field Book: A Practical Guide for Implementing Toyotas 4Ps. McGraw-Hill Companies, New York, USA.,.
Nordin, N., B.M. Deros, D.A. Wahab and M.N. Ab Rahman, 2012. Validation of lean manufacturing implementation framework using Delphi technique. Sci. Eng., 59: 1-6.
Direct Link | Nurcahyo, D.I. and G. Hartono, 2012. [Workload optimization and standardization work to improve work efficiency in finishing outer door process in TMMIN company (in Indonesian)] J. INASEA., 3: 124-131.
Rahani, A.R. and A.M. Ashraf, 2012. Production flow analysis through value stream mapping: A lean manufacturing process case study. Procedia Eng., 41: 1727-1734.
CrossRef | Direct Link | Rohani, J.M. and S.M. Zahraee, 2015. Production line analysis via value stream mapping: A lean manufacturing process of color industry. Procedia Manuf., 2: 6-10.
CrossRef | Direct Link | Rohani, J.M. and S.M. Zahraee, 2015. Production line analysis via value stream mapping: A lean manufacturing process of color industry. Procedia Manuf., 2: 6-10.
CrossRef | Direct Link | Suhardi, B., 2008. Work System Design and Industrial Ergonomic. 1st Edn., Guidance Directorate of Vocational School, USA.,.
Tyagi, S., A. Choudhary, X. Cai, D.K. Yang, 2015. Value stream mapping to reduce the lead-time of product development process. Intl. J. Prod. Econ., 100: 202-212.
Wignjosoebroto, S., 2003. [Time and Motion Study]. 3rd Edn., Guna Widya, France, pp: 126-150 (In Indonesian).