Journal of Engineering and Applied Sciences

Year: 2018
Volume: 13
Issue: 13 SI
Page No. 10545 - 10550

A New Perspective to a Fuzzy Distance Function and its Applications on Fuzzy Due Dates and Cost Function

Authors : Hussam A. Mohammed, Faria A. Cheachan, Hanan A. Cheachan and Rukaibaa A. Cheachan

References

Cheachan, H.A., F.A. Cheachan and H.A. Mohammed, 2011. Fuzzy distance function and its applications on cost function. J. Kerbala Univ., 9: 26-34.
Direct Link  |  

Han, S., H. Ishii and S. Fujii, 1994. One machine scheduling problem with fuzzy duedates. Eur. J. Oper. Res., 79: 1-12.
Direct Link  |  

Hanan, A.C., A.A. Hussam and A.C. Faria, 2013. Fuzzy distances and their applications on fuzzy scheduling. East Eur. J. Adv. Technol., 3: 23-30.

Hong, T.P. and T.N. Chuang, 1999. A new triangular fuzzy Johnson algorithm. Comput. Ind. Eng., 36: 179-200.
CrossRef  |  Direct Link  |  

Ishibuchi, H., N. Yamamoto, S. Misaki and H. Tanaka, 1994. Local search algorithms for flow shop scheduling with fuzzy due-dates. Intl. J. Prod. Econ., 33: 53-66.
CrossRef  |  Direct Link  |  

Ishibuchi, H., N. Yamamoto, T. Murata and H. Tanaka, 1994. Genetic algorithms and neighborhood search algorithms for fuzzy flowshop scheduling problems. Fuzzy Sets Syst., 67: 81-100.
CrossRef  |  Direct Link  |  

Ishii, H. and M. Tada, 1995. Single machine scheduling problem with fuzzy precedence relation. Eur. J. Oper. Res., 87: 284-288.
Direct Link  |  

Itoh, T. and H. Ishii, 1999. Fuzzy due‐date scheduling problem with fuzzy processing time. Int. Trans. Operat. Res., 6: 639-647.
CrossRef  |  Direct Link  |  

Konno, T. and H. Ishii, 2000. An open shop scheduling problem with fuzzy allowable time and fuzzy resource constraint. Fuzzy Set Syst., 109: 141-147.
CrossRef  |  

Kuroda, M. and Z. Wang, 1996. Fuzzy job shop scheduling. Intl. J. Prod. Econ., 44: 45-51.
Direct Link  |  

Lam, S.S. and X. Cai, 2002. Single machine scheduling with nonlinear lateness cost functions and fuzzy due dates. Nonlinear Anal. Real World Appl., 3: 307-316.
CrossRef  |  Direct Link  |  

Litoiu, M. and R. Tadei, 2001. Real-time task scheduling with fuzzy deadlines and processing times. Fuzzy Set Syst., 117: 35-45.
Direct Link  |  

Mohammed, H.A., F.A. Cheachan, H.A. Cheachan and F.A. Cheachan, 2015. On fuzzy distances and their applications on cost function. Trans. Eng. Sci., 3: 40-45.
Direct Link  |  

Peng, J. and B. Liu, 2004. Parallel machine scheduling models with fuzzy processing times. Inf. Sci., 166: 49-66.
CrossRef  |  Direct Link  |  

Pham, D.T., M. Negm and S. Otri, 2008. Using the bees algorithm to solve a stochastic optimization problem. Proceedings of the 4th International Virtual Conference on Intelligent Production Machines and Systems (IPROMS), July 1-14, 2008, Whittles Publishing, Scotland, UK., pp: 1-8.

Prade, H., 1970. Using fuzzy set theory in a scheduling problem: A case study. Fuzzy Sets Syst., 2: 153-165.
CrossRef  |  Direct Link  |  

Stanfield, P.M., R.E. King and J.A. Joines, 1996. Scheduling arrivals to a production system in a fuzzy environment. Eur. J. Oper. Res., 93: 75-87.
CrossRef  |  Direct Link  |  

Design and power by Medwell Web Development Team. © Medwell Publishing 2024 All Rights Reserved