Journal of Engineering and Applied Sciences
Year:
2018
Volume:
13
Issue:
13 SI
Page No.
10545 - 10550
References
Cheachan, H.A., F.A. Cheachan and H.A. Mohammed, 2011. Fuzzy distance function and its applications on cost function. J. Kerbala Univ., 9: 26-34.
Direct Link | Han, S., H. Ishii and S. Fujii, 1994. One machine scheduling problem with fuzzy duedates. Eur. J. Oper. Res., 79: 1-12.
Direct Link | Hanan, A.C., A.A. Hussam and A.C. Faria, 2013. Fuzzy distances and their applications on fuzzy scheduling. East Eur. J. Adv. Technol., 3: 23-30.
Hong, T.P. and T.N. Chuang, 1999. A new triangular fuzzy Johnson algorithm. Comput. Ind. Eng., 36: 179-200.
CrossRef | Direct Link | Ishibuchi, H., N. Yamamoto, S. Misaki and H. Tanaka, 1994. Local search algorithms for flow shop scheduling with fuzzy due-dates. Intl. J. Prod. Econ., 33: 53-66.
CrossRef | Direct Link | Ishibuchi, H., N. Yamamoto, T. Murata and H. Tanaka, 1994. Genetic algorithms and neighborhood search algorithms for fuzzy flowshop scheduling problems. Fuzzy Sets Syst., 67: 81-100.
CrossRef | Direct Link | Ishii, H. and M. Tada, 1995. Single machine scheduling problem with fuzzy precedence relation. Eur. J. Oper. Res., 87: 284-288.
Direct Link | Itoh, T. and H. Ishii, 1999. Fuzzy due‐date scheduling problem with fuzzy processing time. Int. Trans. Operat. Res., 6: 639-647.
CrossRef | Direct Link | Konno, T. and H. Ishii, 2000. An open shop scheduling problem with fuzzy allowable time and fuzzy resource constraint. Fuzzy Set Syst., 109: 141-147.
CrossRef | Kuroda, M. and Z. Wang, 1996. Fuzzy job shop scheduling. Intl. J. Prod. Econ., 44: 45-51.
Direct Link | Lam, S.S. and X. Cai, 2002. Single machine scheduling with nonlinear lateness cost functions and fuzzy due dates. Nonlinear Anal. Real World Appl., 3: 307-316.
CrossRef | Direct Link | Litoiu, M. and R. Tadei, 2001. Real-time task scheduling with fuzzy deadlines and processing times. Fuzzy Set Syst., 117: 35-45.
Direct Link | Mohammed, H.A., F.A. Cheachan, H.A. Cheachan and F.A. Cheachan, 2015. On fuzzy distances and their applications on cost function. Trans. Eng. Sci., 3: 40-45.
Direct Link | Peng, J. and B. Liu, 2004. Parallel machine scheduling models with fuzzy processing times. Inf. Sci., 166: 49-66.
CrossRef | Direct Link | Pham, D.T., M. Negm and S. Otri, 2008. Using the bees algorithm to solve a stochastic optimization problem. Proceedings of the 4th International Virtual Conference on Intelligent Production Machines and Systems (IPROMS), July 1-14, 2008, Whittles Publishing, Scotland, UK., pp: 1-8.
Prade, H., 1970. Using fuzzy set theory in a scheduling problem: A case study. Fuzzy Sets Syst., 2: 153-165.
CrossRef | Direct Link | Stanfield, P.M., R.E. King and J.A. Joines, 1996. Scheduling arrivals to a production system in a fuzzy environment. Eur. J. Oper. Res., 93: 75-87.
CrossRef | Direct Link |