Journal of Engineering and Applied Sciences
Year:
2018
Volume:
13
Issue:
7
Page No.
1676 - 1682
References
Al-Zwainy, F.M.S. and N.T. Hadhal, 2016. Building a Mathematical Model for Predicting the Cost of the Communication Towers Projects Using Multifactor Linear Regression Technique. Int. J. Constr. Eng. Manage., 5: 25-29.
CrossRef | Direct Link | Al-Zwainy, F.M.S., H.A. Rasheed and H.F. Ibraheem, 2012. Development of the construction productivity estimation model using artificial neural network for finishing works for floors with marble. ARPN J. Eng. Appl. Sci., 7: 714-722.
Al-Zwainy, F.M.S., M.H. Abdulmajeed and H.S.M. Aljumaily, 2013. Using multivariable linear regression technique for modeling productivity construction in Iraq. Open J. Civil Eng., 3: 127-135.
CrossRef | Direct Link | Bagherpour, M., A. Zareei, S. Noori and M. Heydari, 2010. Designing a control mechanism using earned value analysis: An application through production environemnt. Int. J. Adv. Manuf. Technol., 49: 419-428.
CrossRef | Chou, J.S., H.M. Chen, C.C. Hou and CW. Lin, 2010. Visualized EVM system for assessing project performance. Automation Construc., 19: 596-607.
CrossRef | Christensen, D.S., 1998. The costs and benefits of the earned value management process. J. Parametrics, 18: 1-16.
Direct Link | Czernigowska, A., 2008. Earned value method as a tool for project control. Constr. Archit., 3: 15-32.
Direct Link | Fleming, Q.W. and J.M. Koppelman, 2005. Earned Value Project Management. 3rd Edn., Project Management Institute, Pennsylvania.
Jigeesh, N. and M.S. Bhat, 2006. Modeling and simulating the dynamics in project monitoring and earned value analysis. J. Adv. Manage. Res., 3: 26-43.
Direct Link | Lipke, W., O. Zwikael, K. Henderson and F. Anbari, 2009. Prediction of project outcome: The application of statistical methods to earned value management and earned schedule performance indexes. Intl. J. Project Manage., 27: 400-407.
Direct Link | Noori, S., M. Bagherpour, A. Zareei, 2008. Applying fuzzy control chart in earned value analysis: A New Application. World Applied Sci. J., 3: 684-690.
Direct Link | Pajares, J. and A. Lopez-Paredes, 2011. An extension of the EVM analysis for project monitoring: The cost control index and the schedule control index. Int. J. Project Manage., 29: 615-621.
CrossRef | Rasool, S.H. and F.M.S. Al-Zwainy, 2016. Estimating Productivity of Brickwork item using Logistic and Multiple Regression Approaches. Scholars J. Eng. Technol., 4: 234-243.
Sarhan, A.F.M., A.M. Ibrahim and D.S. Mohsen, 2015. Earned Value Management in Construction Project. OmniScriptum GmbH & Co. KG, Germany, Europe, ISBN:9783659750786, Pages: 140.
Sarhan, F.M., I.A. Mohammed and D. Sameer, 2014. Evaluation The Performance of The Infrastructure Project Using Earned Value Management. Int. J. Civil. Eng., 5: 145-155.
Direct Link | Thomas, H.R., 2009. Construction learning curves. Pract. Period. Struct. Des. Constr., 14: 14-20.
Direct Link | Warburton, R.D., 2011. A time-dependent earned value model for software projects. Intl. J. Project Manage., 29: 1082-1090.
Direct Link |