Journal of Engineering and Applied Sciences
Year:
2018
Volume:
13
Issue:
14
Page No.
5838 - 5842
References
Al-Ageeli, H.K. and A.S.J.A. Alzobaee, 2016. The most influential factor on the stumble and failure of the governmental projects. J. Eng., 22: 93-110.
Direct Link | Al-Zwainy, F.M.S., I.A. Mohammed and S.H. Raheem, 2016. Investigation and assessment of the Project Management Methodology in Iraqi Construction Sector. Int. J. Appl. Eng. Res., 11: 2494-2507.
Durdyev, S., M. Omarov and S. Ismail, 2017. Causes of delay in residential construction projects in Cambodia. Cogent Eng., 4: 1-12.
CrossRef | Fraser, C., 2000. The influence of personal characteristics on effectiveness of construction site managers. Constr. Manage. Econ., 18: 29-36.
Direct Link | Ndekugri, I., N. Braimah and R. Gameson, 2008. Delay analysis within construction contracting organizations. J. Constr. Eng. Manage., 134: 692-700.
CrossRef | Sadi, A.A., M. Al-Khalil and M. Al-Hazmi, 1995. Causes of delay in large building construction projects. J. Manage. Eng., 11: 45-50.
CrossRef | Direct Link | Santoso, D.S. and S. Soeng, 2016. Analyzing delays of road construction projects in Cambodia: Causes and effects. J. Manage. Eng., Vol. 32, 10.1061/(ASCE)ME.1943-5479.0000467
Sawsan, R., 2014. The causal risks of claims and actions that can be followed to avoid them or reduce them as little as possible. J. Eng., 20: 319-329.
Shabniya, V. and K.M. Dilruba, 2017. A review on construction cost forecasting techniques. Intl. Res. J. Eng. Technol., 4: 3333-3339.
Direct Link |