Journal of Engineering and Applied Sciences

Year: 2019
Volume: 14
Issue: 2 SI
Page No. 5547 - 5549

A Proposed Algorithm to Find Efficient Solutions for Multicriteria Problem

Authors : Adawiya A.Mahmood Al-Nuaimi

References

Akande, S., A.E. Oluleye and E.O. Oyetunji, 2014. Reducibility of some multi criteria scheduling problems to bicriteria scheduling problems. Proceedings of the 2014 International Conference on Industrial Engineering and Operations Management Bali, January 7-9, 2014, Bali, Indonesia, pp: 642-651.

Angelidis, E., D. Bohn and O. Rose, 2013. A simulation tool for complex assembly lines with multi-skilled resources. Proceedings of the 2013 Winter Simulation Conference: Simulation: Making Decisions in a Complex World, December 08-11, 2013, IEEE Press, Washington, DC., USA., ISBN:978-1-4799-2077-8, pp: 2577-2586.

Du, W., S.Y.S. Leung, Y. Tang and A.V. Vasilakos, 2017. Differential evolution with event-triggered impulsive control. IEEE. Trans. Cybern., 47: 244-257.
CrossRef  |  PubMed  |  Direct Link  |  

Eiben, A.E. and J. Smith, 2015. From evolutionary computation to the evolution of things. Nat., 521: 476-482.
CrossRef  |  Direct Link  |  

Eren, T., 2007. A multicriteria scheduling with sequence-dependent setup times. Appl. Math. Sci., 1: 2883-2894.
Direct Link  |  

Hermann J.W., 2007. How to improve production scheduling. Master Thesis, Institute for Systems Research University of Maryland, College Park, Maryland.

Hoogeveen, J.A., 2005. Invited review of multicriteria scheduling. Eur. J. Oper. Res., 167: 592-623.

Pinedo, M., 2008. Scheduling: Theory, Algorithms and Systems. Springer, New York, USA., ISBN-13: 9780387789347, Pages: 671.

Simeonovova, I., A. Gyurov and S. Simeonov, 2015. Modern methods for manufacturing planning and scheduling. MM. Sci. J., 2015: 635-639.
CrossRef  |  Direct Link  |  

Design and power by Medwell Web Development Team. © Medwell Publishing 2024 All Rights Reserved