Journal of Engineering and Applied Sciences

Year: 2019
Volume: 14
Issue: 20
Page No. 7442 - 7447

Earned Value Management for Ship Repair Project

Authors : Silvianita , Fadel Muhammad, Daniel M. Rosyid and Wimala Dhanista

References

Barrie, D.S., 1995. Project Management Strategic Design and Implementation. McGraw Hill Inc., Singapore,.

Batselier, J. and M. Vanhoucke, 2015. Empirical evaluation of earned value management forecasting accuracy for time and cost. J. Constr. Eng. Manage., 141: 1-13.
CrossRef  |  Direct Link  |  

Cleland, D.I., 1991. Project Management Strategic Design and Implementation. 3rd Edn., McGraw Hill, Singapore.

Czemplik, A., 2014. Application of earned value method to progress control of construction projects. Procedia Eng., 91: 424-428.
CrossRef  |  Direct Link  |  

Gray, C.F. and E.W. Larson, 2008. Project Management The managerial Process. 4th Edn., McGraw Hill, New York.

Hanna, A.S., 2011. Using the earned value management system to improve electrical project control. J. Constr. Eng. Manage., 138: 449-457.
CrossRef  |  Direct Link  |  

Hanna, A.S., 2011. Using the earned value management system to improve electrical project control. J. Constr. Eng. Manage., 138: 449-457.
CrossRef  |  Direct Link  |  

Henderson, K., 2003. Earned schedule: A breakthrough extension to earned value theory? A retrospective analysis of real project data. Measurable News, 1: 13-23.

Kwak, Y.H. and F.T. Anbari, 2012. History, practices and future of earned value management in government: Perspectives from NASA. Project Manage. J., 43: 77-90.
CrossRef  |  Direct Link  |  

Lipke, W., 2003. Schedule is different. Measurable News, 1: 31-34.

PMI., 2013. A Guide to the Project Management Body of Knowledge: PMBOK Guide. 5th Edn., Project Management Institute, Newtown Square, US., ISBN-13: 9781935589679, Pages: 589.

Silvianita, M.F. Khamidi, Suntoyo and D.M. Chamelia, 2018. Methodology for Investigation of Risk Based Maintenance (MIRBA) for mobile mooring system. Res. J. Appl. Sci., 13: 26-33.
CrossRef  |  Direct Link  |  

Silvianita, S., M.F. Khamidi and V.J. Kurian, 2013. Decision making for safety assessment of mobile mooring system. Jurnal Teknologi, 61: 41-52.
Direct Link  |  

Wilson, B., M. Frolick and T. Ariyachandra, 2013. Earned value management systems: Challenges and future direction. J. Integr. Enterp. Syst., 2: 9-17.
Direct Link  |  

Design and power by Medwell Web Development Team. © Medwell Publishing 2024 All Rights Reserved