Journal of Engineering and Applied Sciences

Year: 2020
Volume: 15
Issue: 7
Page No. 1618 - 1621

Adopting BIM in the Jordanian Private Construction Industry Case Study

Authors : Ja`far A. Aldiabat Albtoosh, Mohammed A. K.A. AL-Btoush, Mohammad Al-Rawashdeh and Omar Mostafa Alomari

References

Al-Moumani, H.A., 2000. Construction delay: A quantitative analysis. Int. J. Project Manage., 18: 51-59.
CrossRef  |  Direct Link  |  

Almuntaser, T., M.O. Sanni-Anibire and M.A. Hassanain, 2018. Adoption and implementation of BIM-case study of a Saudi Arabian AEC firm. Int. J. Managing Projects Bus., 11: 608-624.
CrossRef  |  Direct Link  |  

Alshdiefat, A.S., 2018. Developing an assessment model for the adoption of building information modelling to reduce the cost of change orders in the Jordanian construction industry. Ph.D. Thesis, University of Salford, Greater Manchester, England.

Ansah, R.H. and S. Sorooshian, 2017. Effect of lean tools to control external environment risks of construction projects. Sustainable Cities Soc., 32: 348-356.
Direct Link  |  

Aranda‐Mena, G., J. Crawford, A. Chevez and T. Froese, 2009. Building information modelling demystified: Does it make business sense to adopt BIM? Int. J. Managing Projects Bus., 2: 419-434.
CrossRef  |  Direct Link  |  

Arayici, Y., C.O. Egbu and S.P. Coates, 2012. Building Information Modelling (BIM) implementation and remote construction projects: Issues, challenges and critiques. J. Inf. Technol. Constr., 17: 75-92.
Direct Link  |  

Arayici, Y., P. Coates, L. Koskela, M. Kagioglou, C. Usher and K. O’Reilly, 2011. Technology adoption in the BIM implementation for lean architectural practice. Autom. Constr., 20: 189-195.
CrossRef  |  Direct Link  |  

Assaf, S.A. and S. Al-Hejji, 2006. Causes of delay in large construction projects. Int. J. Project Manage., 24: 349-357.
CrossRef  |  

Gerges, M., S. Austin, M. Mayouf, O. Ahiakwo and M. Jaeger et al., 2017. An investigation into the implementation of building information modeling in the middle East. J. Inf. Technol. Constr., 22: 1-15.
Direct Link  |  

Khosrowshahi, F. and Y. Arayici, 2012. Roadmap for implementation of BIM in the UK construction industry. Eng. Constr. Archit. Manage., 19: 610-635.
CrossRef  |  Direct Link  |  

Mehran, D., 2016. Exploring the adoption of BIM in the UAE construction industry for AEC firms. Procedia Eng., 145: 1110-1118.
CrossRef  |  Direct Link  |  

Mihindu, S. and Y. Arayici, 2008. Digital construction through BIM systems will drive the re-engineering of construction business practices. Proceedings of the 2008 International Conference on Visualisation, July 9-11, 2008, IEEE, London, UK, pp: 29-34.

Smith, P., 2014. BIM implementation-global strategies. Procedia Eng., 85: 482-492.
CrossRef  |  Direct Link  |  

Sweis, G., R. Sweis, A. Abu Hammad and A. Shbould, 2008. Delays in construction projects: The case of Jordan. Int. J. Project Manage., 26: 665-674.
CrossRef  |  

Tahir, M.M., N.A. Haron, A.H. Alias, A.N. Harun, I.B. Muhammad and D.L. Baba, 2018. Improving cost and time control in construction using Building Information Model (BIM): A review. Pertanika J. Sci. Technol., 26: 21-36.
Direct Link  |  

Design and power by Medwell Web Development Team. © Medwell Publishing 2024 All Rights Reserved