Research Journal of Applied Sciences
Year:
2018
Volume:
13
Issue:
12
Page No.
736 - 741
References
Anand, J. and S.C. Malik, 2012. Analysis of a computer system with arbitrary distributions for H/W and S/W replacement time and priority to repair activities of h/w over replacement of S/W. Intl. J. Syst. Assur. Eng. Manage., 3: 230-236.
CrossRef | Direct Link | Kumar, A. and S.C. Malik, 2012. Stochastic modeling of a computer system with priority to PM over S/W replacement subject to maximum operation and repair times. Intl. J. Comput. Appl., 43: 27-34.
CrossRef | Direct Link | Kumar, A. and S.C. Malik, 2012. Stochastic modeling of a computer system with priority to PM over S/W replacement subject to maximum operation and repair times. Intl. J. Comput. Appl., 43: 27-34.
CrossRef | Direct Link | Kumar, A. and S.C. Malik, 2014. Reliability modelling of a computer system with priority to H/W repair over replacement of H/W and up-Gradation of S/W Subject to MOT and MRT. J. Mech. Ind. Eng., 8: 233-241.
Direct Link | Kumar, A., M. Saini and S.C. Malik, 2015. Performance analysis of a computer system with imperfect fault detection of hardware. Procedia Comput. Sci., 45: 602-610.
CrossRef | Direct Link | Malik, S.C. and J. Anand, 2010. Reliability and economic analysis of a computer system with independent hardware and software failures. Bull. Pure Appl. Sci., 29: 141-153.
Direct Link | Malik, S.C. and J.K. Sureria, 2012. Profit analysis of a computer system with H/W repair and S/W replacement. Intl. J. Comput. Appl., 47: 19-26.
Direct Link | Malik, S.C. and V.J. Munday, 2014. Stochastic modelling of a computer system with hardware redundancy. Intl. J. Comput. Appl., 89: 26-30.
CrossRef | Direct Link | Malik, S.C., 2013. Reliability modeling of a computer system with preventive maintenance and priority subject to maximum operation and repair times. Intl. J. Syst. Assur. Eng. Manage., 4: 94-100.
CrossRef | Direct Link | Wang, K.H. and C.C. Kuo, 2000. Cost and probabilistic analysis of series systems with mixed standby components. Applied Math. Modell., 24: 957-967.
CrossRef | Direct Link | Wang, K.H. and J.C. Ke, 2003. Probabilistic analysis of a repairable system with warm standbys plus balking and reneging. Appl. Math. Modell., 27: 327-336.
CrossRef | Direct Link | Wang, K.H. and W.L. Pearn, 2003. Cost benefit analysis of series systems with warm standby components. Math. Methods Oper. Res., 58: 247-258.
CrossRef | Wang, K.H., C.H. Hsieh and C.H. Liou, 2006. Cost benefit analysis of series systems with cold standby components and a repairable service station. J. Quality Technol. Quant. Manage., 3: 77-92.
CrossRef | Direct Link | Wang, K.H., Y.J. Liou and W.L. Pearn, 2005. Cost benefit analysis of series systems with warm standby components and general repair times. Math. Methods Oper. Res., 61: 329-343.
CrossRef | Welke, S.R., B.W. Johnson and J.H. Aylor, 1995. Reliability modeling of hardware/software systems. IEEE. Trans. Reliab., 44: 413-418.
CrossRef | Direct Link |