Journal of Engineering and Applied Sciences

Year: 2019
Volume: 14
Issue: 14
Page No. 4961 - 4967

Trade-Off Between Cost and Time to the Project to Assist in Decision-Making Using Multi-Objective Genetic Algorithm (MOGA)

Authors : Sarmad Nasser Mohammed and Ahmed Abdulrasool Alkhafaji

References

Afruzi, E.N., E. Roghanian, A.A. Najafi and M. Mazinani, 2013. A multi-mode resource-constrained discrete time-cost tradeoff problem solving using an adjusted fuzzy dominance genetic algorithm. Sci. Iranica, 20: 931-944.
CrossRef  |  Direct Link  |  

Aminbakhsh, S. and R. Sonmez, 2016. Pareto front particle swarm optimizer for discrete time-cost trade-off problem. J. Comput. Civ. Eng., 31: 04016040-1-04016040-10.
CrossRef  |  Direct Link  |  

Bajpai, P. and M. Kumar, 2010. Genetic algorithm-an approach to solve global optimization problems. Indian J. Comput. Sci. Eng., 1: 199-206.
Direct Link  |  

Ding, C.H., S. Fujimura, X. Wei and W. Wei, 2010. Time-cost trade-off problem under uncertainty incorporating multi-objective genetic algorithm and fuzzy sets theory. Proceedings of the 2010 IEEE 17th International Conference on Industrial Engineering and Engineering Management, October 29-31, 2010, IEEE, Xiamen, China, ISBN:978-1-4244-6483-8, pp: 290-294.

Hooshyar, B., A. Tahmani and M. Shenasa, 2008. A genetic algorithm to time-cost trade-cost trade off in project scheduling. Proceedings of the 2008 IEEE International Congress on Evolutionary Computation (IEEE World Congress on Computational Intelligence), June 1-6, 2008, IEEE, Hong Kong, China, ISBN:978-1-4244-1822-0, pp: 3081-3086.

Ke, H., W. Ma and Y. Ni, 2009. Optimization models and a GA-based algorithm for stochastic time-cost trade-off problem. Applied Math. Comput., 215: 308-313.
CrossRef  |  

Konak, A., D.W. Coit and A.E. Smith, 2006. Multi-objective optimization using genetic algorithms: A tutorial. Reliab. Eng. Syst. Saf., 91: 992-1007.
CrossRef  |  

Mazlum, M. and A.F. Guneri, 2015. CPM, PERT and project management with fuzzy logic technique and implementation on a business. Procedia Soc. Behav. Sci., 210: 348-357.
CrossRef  |  Direct Link  |  

Paryzad, B. and N.S. Pour, 2013. Time-cost-quality trade-off in project with using invasive weed optimization algorithm. J. Basic Appl. Sci. Res., 3: 134-142.

Sahu, K. and M. Sahu, 2014. Cost and time and also minimum project duration using alternative method. Intl. Rev. Appl. Eng. Res., 4: 403-412.
Direct Link  |  

Van Sickel, J.H., P. Venkatesh and K.Y. Lee, 2008. Analysis of the pareto front of a multi-objective optimization problem for a fossil fuel power plant. Proceedings of the 2008 IEEE Power and Energy Society General Meeting On Conversion and Delivery of Electrical Energy in the 21st Century, July 20-24, 2008, IEEE, Pittsburgh, Pennsylvania, ISBN:978-1-4244-1905-0, pp: 1-8.

Design and power by Medwell Web Development Team. © Medwell Publishing 2024 All Rights Reserved