Implementation of Critical Chain Project Management (CCPM) and Critical Path Method (CPM) on Scheduling Ship Repair Project

Authors : Silvianita , Guna Wirawan, Daniel M. Rosyid, Suntoyo and Wimala L. Dhanistha

References

Arinto, A., 2010. Exploring bar chart method, CPM, PDM, PERT, line of balance, and time chainage diagram in project scheduling construction. Master Thesis, Diponegoro University, Semarang, Indonesia.

Aulady, M.F.N. and C. Orleans, 2016. [Comparison of the duration of time between the critical Construction Project Path Method (CPM) with the critical chain project management method (case study: Rungkut tower apartament construction project) (In Indonesian)]. Sci. Technol. J., 20: 13-24.
Direct Link  |  

Butler, D., 2000. A Guide to Ship Repair Estimates in Man-Hours. Butterworths-Heinemann, Oxford, UK., ISBN:9780080478005, Pages: 96.

Firmansyah, R., D.M. Rosyid and D.M. Chamelia, 2018. Fast missile boat project planning using CPM and what if analysis method. IOP. Conf. Ser. Earth Environ. Sci., 135: 1-7.
CrossRef  |  Direct Link  |  

Goldratt, E.M., 1997. Critical Chain. North River Press, Great Barrington, Massachusetts, ISBN:9780884271536, Pages: 246.

Leach, L.P., 2000. Critical Chain Management. 2nd Edn., Artech House, Norwood, Massachusetts, USA., ISBN:9781580530743, Pages: 330.

Newbold, R.C., 1998. Project Management in the Fast Lane: Applying the Theory of Constraints. St. Lucie Press Inc., Florida, USA., ISBN:9781420049152, Pages: 320.

PMI., 2013. A Guide to the Project Management Body of Knowledge: PMBOK(R) Guide. 5th Edn., Project Management Institute, Pennsylvania, USA., ISBN-13: 978-1935589679, Pages: 589.

Shafiq, N., 2010. Prioritizing the pipeline maintenance approach using analytical hierarchical process. Intl. Rev. Mech. Eng., 4: 346-352.

Shurrab, M., 2015. Traditional critical path method versus critical Chain project management: A comparative view. Intl. J. Econ. Manage. Sci., 4: 1-6.
CrossRef  |  Direct Link  |  

Silvianita, A. Nurbaity, Y. Mulyadi, Suntoyo and D.M. Chamelia, 2018. Project scheduling based on risk of gas transmission pipe. IOP. Conf. Ser. Earth Environ. Sci., 135: 1-10.
CrossRef  |  Direct Link  |  

Soeharto, I., 1995. [Project Management, From Conceptual to Operational]. Penerbit Erlangga, Jakarta, Indonesia, Pages: 755 (In Indonesian).

Valikoniene, L., 2015. Resource buffers in critical chain project management. Ph.D Thesis, University of Manchester, Manchester, UK.

Design and power by Medwell Web Development Team. © Medwell Publishing 2024 All Rights Reserved